Department of Environmental Services

Traffic Advisory – Sewer Work:  April 7-11, 2025

HONOLULU The Department of Environmental Services alerts the public of traffic affected next week as city crews and contractors conduct sewer work between the hours of 8:30 a.m. and 3:30 p.m. (or *8 p.m. and 6 a.m.). Dates and locations provided below:  

 

Apr 72316-2563 Pacific Heights RoadNuuanuManhole Rehabilitation
Apr 7475 Kainalu DriveKailuaMain Rehabilitation
Apr 7159 Uilama StreetKailuaLateral Rehabilitation
Apr 82349-2542 Pacific Heights RoadNuuanuManhole Rehabilitation
Apr 82011-2029 Puowaina DriveNuuanuManhole Rehabilitation
Apr 8560 Kainalu DriveKailuaMain Rehabilitation
Apr 8529/703 Maluniu AveKailuaMain Rehabilitation
Apr 8-10529/639/725 Maluniu AveKailuaMain Rehabilitation
Apr 92316-2563 Pacific Heights RoadNuuanuManhole Rehabilitation
Apr 9445 Kainalu DriveKailuaLateral Rehabilitation
Apr 10319 Kalama StreetKailuaLateral Rehabilitation
Apr 102011-2029 Puowaina DriveNuuanuManhole Rehabilitation
Apr 102349-2542 Pacific Heights RoadNuuanuManhole Rehabilitation
Apr 11235 Uilama StreetKailuaLateral Rehabilitation
Apr 112316-2563 Pacific Heights RoadNuuanuManhole Rehabilitation
Apr 112030-2694 Pacific Heights RoadNuuanuLateral Rehabilitation
Apr 112130 Booth RoadNuuanuMain Rehabilitation
Apr 112350/2542 Pacific Heights RoadNuuanuMain Rehabilitation

Hart Street/Waiakamilo Road Replacement Sewer Project

            Waiakamilo Rd. between Dillingham Blvd. and Hart St.

                        (1415 Dillingham Blvd. to 420 Waiakamilo Rd.)

URL:  Sewer Projects Construction Map

─ PAU ─

Stay connected with ENV on social media:

Facebook:  HNL.ENV1                     Twitter:  @hnl_env                   YouTube:  ENV                   Instagram: hnl.env

Scroll to Top
Skip to content